Skip to main content

Posts

Showing posts from October, 2023

How Does JRPanel Assemble Your Membrane Switches

Let's talk about the assembly of membrane switches. 1.  Installing LED and baking   For products that require LEDs, JRPanel engineers will attach the LEDs to the corresponding circuits. The printed circuits are subsequently put into the oven for baking.   2.  Cutting Cable   Engineers will cut out the cables in bulk with a cutting die or laser cutting.   3.  Installing Male Pin   Before installing the Male Pin, the end of the Cable must be cut flat. Next, the Cable is placed under the machine and by pressure, the Male Pin is positioned and fixed at the end of the Cable. This step is to ensure the conductivity of the product.   4.  Silver Paste Die-pressing   Silver paste die-pressing is a heat embossing process on the circuit layer with a die. At JRPanel, the dies used for this process are all aluminum plates. Therefore, compared to metal domes, the die-pressing process results in the long service life of the keys.   5.  Attaching Backing Adhesive   Attach the adhesive to the back